Selamat Datang PELAWAT

[ LAMAN PAPARAN LAPORAN KHIDMAT BANTU ICT ]



MAKLUMAT LAPORAN KHIDMAT BANTU ICT PTIS BAU


NO. ID LAPORAN: PTISB/LOG/399
Tarikh & Masa 07-07-2026 (09:30)
Nama Sekolah SMK PAKU - YEA1101
Kaedah Pelaksanaan Kunjungan Tapak
Tugasan Yang Dilaksana SESI PENGESAHAN TAPAK UNTUK NSI PROJEK BERSAMA PIHAK SURUHANJAYA KOMUNIKASI DAN MCMC.
JTK Bertugas
  • HERMALINA BINTI RAINI
  • HEYWOOD ANAK JEHIA
  • NUR SHAFINA BINTI MOHAMED RAFEEK
Penemuan / Masalah 1.PEMERIKSAAN PEMASANGAN TIANG 4 BATANG.
2.PEMERIKSAAN FIBER TERMINATION BOX (FTB).
3.PEMERIKSAAN FIBER WALL SOCKET (FWS)
Tindakan / Penyelesaian 1.MEMBUAT BACAAN UJIAN OTDR (PANJANG KABEL)
-BILIK PUSAT SUMBER - NSI FDP-FTB1-FWS1 (122 METER) =127.68 (5M PATCH CODE).
-BILIK PEJABAT AM - NSI FDP-FTB2-FWS2 (177 METER) =182.26 (5M PATCH CODE).
-BILIK KOMPUTER -NSI FDP- FTB3- FWS3 (306 METER) = 312.50 (5M PATCH CODE)

2.MEMBUAT BACAAN UJIAN POWER METER
-BILIK PUSAT SUMBER- FWS1-FTB1-NSI FDP (-18.16 DBM)= 18.85 DBM
-PEJABAT AM - FWS2-FTB2-NSI FDP (-21.21 DBM)=21.50 DBM
-BILIK KOMPUTER -FWS3-FTB3-NSI FDP (-19.85 DBM)= -17.64 DBM
Status Selesai
Gambar Laporan
Gambar Laporan
Gambar Laporan
Gambar Laporan
Gambar Laporan
Gambar Laporan

HERMALINA BINTI RAINI
JURUTEKNIK KOMPUTER - FT1
PASUKAN TEKNIKAL ICT SEKOLAH (PTIS), PPD BAU
09-07-2026